Quick answers
What is Sand/ Morrum Mining from Dhasan Riverbed?
Sand/ Morrum Mining from Dhasan Riverbed is an approved mining project in Kachir, Garautha, Jhansi, Uttar Pradesh. The site covers 3.1 acres.
Who is building it?
The applicant is Shankar Rajpoot Infratech Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 28 May 2025), as of 27 Nov 2026.
Where is it?
In Kachir, Garautha, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.8 crore and a site of 3.1 acres.
When was it filed?
The application was filed on 24 Apr 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 28 May 2025 |
| Application filed | 24 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shankar Rajpoot Infratech Private Limited |
| Land area | 3.1 acres (1.3 ha) |
| Project cost | ₹1.8 crore |
| Village / locality | Kachir |
| Taluk / tehsil | Garautha |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03312 |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3.1 acres, this one is smaller than 80% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Kachir, Garautha, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Reserved Forest Land to Be Diverted for Construction of Bridge,… — in-principle approval, conditions pending, 3.1 km away
- Proposed Reserved Forest Land to Be Diverted for Construction of Bridge,… — in-principle approval, conditions pending, 3.1 km away
- Proposed Reserved Forest Land to Be Diverted for Construction of Bridge,… — lapsed, 3.1 km away
- Proposed Forest Land to Be Diverted for Construction of Bridge, Approach Road,… — lapsed, 3.1 km away
- Morrum Mining from Dhasan River Bed — environmental approval granted, 3.8 km away
- Morrum Mining from Dhasan River Bed — cleared for impact study, 3.8 km away
- Environmental Clearance for Proposed Sand/Morrum Mining from Dhasan Riverbed… — lapsed, 3.8 km away
- Proposed project of Riverbed Sand/Morrum Mining from Riverbed of Dhasan River… — under environmental review, 5.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.