Quick answers
What is Morrum Mining from Dhasan River Bed?
Morrum Mining from Dhasan River Bed is an approved mining project in Dhamnor, Garautha, Jhansi, Uttar Pradesh. The site covers 59.3 acres.
Who is building it?
The applicant is K P Singh Bhadoria Contractor.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 17 Oct 2026), as of 27 Nov 2026.
Where is it?
In Dhamnor, Garautha, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹111.2 crore and a site of 59.3 acres.
When was it filed?
The application was filed on 24 Apr 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 17 Oct 2026 |
| Application filed | 24 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | K P Singh Bhadoria Contractor |
| Land area | 59.3 acres (24 ha) |
| Project cost | ₹111.2 crore |
| Village / locality | Dhamnor |
| Taluk / tehsil | Garautha |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04376 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 24 Apr 2026 (this page) | Environmental approval granted | 59.3 acres | ₹111.2 crore |
| Early planning filed 4 Sept 2025 | Cleared for impact study | 59.3 acres | ₹111.2 crore |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 59.3 acres, this one is larger than 94% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Dhamnor, Garautha, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Morrum Mining from Dhasan River Bed — cleared for impact study, 0 m away
- Environmental Clearance for Proposed Sand/Morrum Mining from Dhasan Riverbed… — lapsed, 0 m away
- Proposed project of Riverbed Sand/Morrum Mining from Riverbed of Dhasan River… — under environmental review, 1.3 km away
- Proposed project of Riverbed Sand/Morrum Mining from Riverbed of Dhasan River… — cleared for impact study, 1.3 km away
- Sand/ Morrum Mining from Dhasan Riverbed — environmental approval granted, 3.8 km away
- Kharwanch Sand/Morrum Mining Project on Dhasan River — cleared for impact study, 3.9 km away
- Kharwanch Sand/Morrum Mining Project on Dhasan River — environmental approval granted, 3.9 km away
- "Sand/Morrum Mine" from Riverbed of Dhasan River, Village- Gadhar, Gata No.-… — under environmental review, 4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.