Quick answers
What is this project?
Proposed Forest Land to Be Diverted for Construction of Bridge, Approach Road, Additional Approach Road and Its Protective Work is a lapsed road project in Kachir, Garautha, Jhansi, Uttar Pradesh. The site covers 229 acres.
Who is building it?
The applicant is Construction Division-3 Pwd Jhansi.
Has it been approved?
No. The application was lapsed on 5 Mar 2026, so it is no longer under consideration.
Where is it?
In Kachir, Garautha, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹108.1 crore; a site of 229 acres and 35.4 acres (14.3 ha) of forest land.
When was it filed?
The application was filed on 24 Jan 2026.
Project details
| Official title | Proposed Forest Land to Be Diverted for Construction of Bridge, Approach Road, Additional Approach Road and Its Protective Work in District:-Jhansi & Hamirpur (Up). |
|---|---|
| Status | Lapsed |
| Status since | 5 Mar 2026 |
| Application filed | 24 Jan 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Construction Division-3 Pwd Jhansi |
| Land area | 229 acres (92.7 ha) |
| Forest land | 35.4 acres (14.3 ha) |
| Project cost | ₹108.1 crore |
| Village / locality | Kachir |
| Taluk / tehsil | Garautha |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06460 |
In context
12 applications in Jhansi since January 2022 are in the same category (Roads & highways): 1 approved, 5 filed or under review, and 6 withdrawn, lapsed or rejected. At 229 acres, this one is larger than 64% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kachir, Garautha, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Reserved Forest Land to Be Diverted for Construction of Bridge,… — in-principle approval, conditions pending, 0 m away
- Proposed Reserved Forest Land to Be Diverted for Construction of Bridge,… — lapsed, 0 m away
- Proposed Reserved Forest Land to Be Diverted for Construction of Bridge,… — in-principle approval, conditions pending, 0 m away
- Sand/ Morrum Mining from Dhasan Riverbed — environmental approval granted, 3.1 km away
- "Sand/Morrum Mining" at Gata No. 118kha (Khand No.1), Village- Ramora, Tehsil-… — under environmental review, 4.5 km away
- Morrum Mining from Dhasan River Bed — environmental approval granted, 5.7 km away
- Morrum Mining from Dhasan River Bed — cleared for impact study, 5.7 km away
- Environmental Clearance for Proposed Sand/Morrum Mining from Dhasan Riverbed… — lapsed, 5.7 km away
More from Construction Division-3 Pwd Jhansi in Jhansi
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.