Quick answers
What is this project?
Proposed Project of "Sand/Morrum Mining" at Gata No. 1419 (Khand-3), Mining Lease Area 12.00 ha, Village: Moti Katra, Tehsil: Garautha, District: Jhansi, Uttar Pradesh .Ecopro Mines and Minerals Pvt.Ltd. Director-Shri Aditya Chopra,Lease Area: 12.00 Hectares Hectares is a lapsed mining project in Moti Katra, Garautha, Jhansi, Uttar Pradesh. The site covers 29.7 acres.
Who is building it?
The applicant is Ecopro Mines and Minerals Private Limited.
Has it been approved?
No. The application was lapsed on 9 Mar 2026, so it is no longer under consideration.
Where is it?
In Moti Katra, Garautha, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1 crore and a site of 29.7 acres.
When was it filed?
The application was filed on 30 Oct 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 9 Mar 2026 |
| Application filed | 30 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ecopro Mines and Minerals Private Limited |
| Land area | 29.7 acres (12 ha) |
| Project cost | ₹1 crore |
| Village / locality | Moti Katra |
| Taluk / tehsil | Garautha |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03609 |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 29.7 acres, this one is larger than 77% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Moti Katra, Garautha, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Motikatra Sand/Morrum Mining Project on Dhasan River — environmental approval granted, 3.1 km away
- "Sand/Morrum Mining" at Gata No. 118kha (Khand No.1), Village- Ramora, Tehsil-… — under environmental review, 3.5 km away
- Proposed Reserved Forest Land to Be Diverted for Construction of Bridge,… — in-principle approval, conditions pending, 7 km away
- Proposed Reserved Forest Land to Be Diverted for Construction of Bridge,… — in-principle approval, conditions pending, 7 km away
- Proposed Reserved Forest Land to Be Diverted for Construction of Bridge,… — lapsed, 7 km away
- Proposed Forest Land to Be Diverted for Construction of Bridge, Approach Road,… — lapsed, 7 km away
- Sand/ Morrum Mining from Dhasan Riverbed — environmental approval granted, 8.7 km away
- Morrum Mining from Dhasan River Bed — environmental approval granted, 12.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.