Quick answers
What is this project?
"Sand/Morrum Mining" at Gata No. 118kha (Khand No.1), Village- Ramora, Tehsil- Garautha, District- Jhansi, Uttar Pradesh, M/s Saigun Buildhomes Private Limited Director- Shri Avanish Kumar Gautam is a proposed mining project in Ramaura, Garautha, Jhansi, Uttar Pradesh. The site covers 59.3 acres.
Who is building it?
The applicant is Avanish Kumar Gautam.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Ramaura, Garautha, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹95 lakh and a site of 59.3 acres.
When was it filed?
The application was filed on 30 Jun 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 2 Sept 2026 |
| Application filed | 30 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Avanish Kumar Gautam |
| Land area | 59.3 acres (24 ha) |
| Project cost | ₹95 lakh |
| Village / locality | Ramaura |
| Taluk / tehsil | Garautha |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04255 |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 59.3 acres, this one is larger than 94% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Ramaura, Garautha, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of "Sand/Morrum Mining" at Gata No. 1419 (Khand-3), Mining… — lapsed, 3.5 km away
- Proposed Reserved Forest Land to Be Diverted for Construction of Bridge,… — in-principle approval, conditions pending, 4.5 km away
- Proposed Reserved Forest Land to Be Diverted for Construction of Bridge,… — in-principle approval, conditions pending, 4.5 km away
- Proposed Reserved Forest Land to Be Diverted for Construction of Bridge,… — lapsed, 4.5 km away
- Proposed Forest Land to Be Diverted for Construction of Bridge, Approach Road,… — lapsed, 4.5 km away
- Proposed Motikatra Sand/Morrum Mining Project on Dhasan River — environmental approval granted, 6 km away
- Sand/ Morrum Mining from Dhasan Riverbed — environmental approval granted, 7.1 km away
- Morrum Mining from Dhasan River Bed — environmental approval granted, 10.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.