Quick answers
What is this project?
High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-I) in the state of Uttar Pradesh (Package-5, Ch. from 214+350 to Ch. 273+415) is a proposed road project in Bhatpurataran, Bilaspur, Rampur, Uttar Pradesh.
Who is building it?
The applicant is National Highway Authority of India.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 5 Mar 2026), as of 27 Nov 2026.
Where is it?
In Bhatpurataran, Bilaspur, Rampur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹2,664.8 crore.
When was it filed?
The application was filed on 23 Jan 2026.
Project details
| Official title | Development of High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-I) in the state of Uttar Pradesh (Package-5, Ch. from 214+350 to Ch. 273+415). |
|---|---|
| Status | Cleared for impact study |
| Status since | 5 Mar 2026 |
| Application filed | 23 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Roads & highways |
| Applicant | National Highway Authority of India |
| Project cost | ₹2,664.8 crore |
| Village / locality | Bhatpurataran |
| Taluk / tehsil | Bilaspur |
| District | Rampur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04610 |
In context
9 applications in Rampur since January 2022 are in the same category (Roads & highways): 1 approved, 4 filed or under review, and 4 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhatpurataran, Bilaspur, Rampur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-I) in the… — returned to applicant, 0 m away
- High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-I) in the… — more information requested, 4.2 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — forest land use approved, 4.5 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to… — lapsed, 8.3 km away
- Protected Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 9.1 km away
- Expansion of existing Sugar unit from 5,000 TCD to 10,000 TCD — environmental approval granted, 9.3 km away
- Expansion of existing Sugar unit from 5,000 TCD to 10,000 TCD — cleared for impact study, 9.3 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to… — forest land use approved, 10.1 km away
More from National Highway Authority of India in Rampur
- High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-I) in the… — more information requested
- High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-I) in the… — returned to applicant
3 National Highways Authority of India (NHAI) projects in Rampur
All 548 National Highways Authority of India (NHAI) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.