Quick answers
What is this project?
Proposed expansion project by installation of 4X30 T Induction Furnaces instead of 4X20 T Induction Furnaces, 4,00,000 TPA Capacity Continuous Casting Machine instead of 2,40,000 TPA Capacity, 4,00,000 TPA Capacity Rolling Mill instead of 2,00,000 TPA Capacity (as per previous EC vide Memo No. 1775/En/T-II-1/068/2015 dated 17.08.2017 and Transfer of EC dated 31.08.2021, issued by SEIAA, West Bengal) and New installation of 1x35 TPH Capacity Slag Crusher Unit, 1x15,000 TPM Capacity Galvanizing is an approved industrial project in Hatashuria, Barjora, Bankura, West Bengal. The site covers 19.7 acres.
Who is building it?
The applicant is M/S Advay Udyog PVT. LTD..
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 21 Nov 2022), as of 27 Nov 2026.
Where is it?
In Hatashuria, Barjora, Bankura, West Bengal.
How big is it?
It has a stated cost of ₹210 crore and a site of 19.7 acres.
When was it filed?
The application was filed on 21 Nov 2022.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 21 Nov 2022 |
| Application filed | 21 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | M/S Advay Udyog PVT. LTD. |
| Land area | 19.7 acres (8 ha) |
| Project cost | ₹210 crore |
| Village / locality | Hatashuria |
| Taluk / tehsil | Barjora |
| District | Bankura |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00043 |
In context
69 applications in Bankura since January 2022 are in the same category (Industry): 29 approved, 23 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 19.7 acres, this one is smaller than 52% of them.
32 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hatashuria, Barjora, Bankura, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by SBEG Consultants Pvt. Ltd. — lapsed, 200 m away
- Expansion of Existing Secondary Metallurgical Unit by Installing Additional… — cleared for impact study, 650 m away
- Diversion of Forest Land at Mouza-Saharjora (Plasto Steel Park) for Setting of… — not approved, 850 m away
- Environment Clearance (in compliance of the NGT order dt. 12.02.2020 in… — cleared for impact study, 950 m away
- Proposed 0.13 MTPA Ferro Alloys Plant (6 X 9 MVA SAF, 2X6 T EAF, 2X15 T AOD,… — environmental approval granted, 1.2 km away
- Transfer of Environmental Clearance (EC) granted by the Ministry of… — returned to applicant, 1.2 km away
- Transfer of Environmental Clearance (EC) granted by the Ministry of… — returned to applicant, 1.2 km away
- Proposed 0.13 MTPA Ferro Alloys Plant (6 X 9 MVA SAF, 2X6 T EAF, 2X15 T AOD,… — under environmental review, 1.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.