Quick answers
What is this project?
Diversion of Forest Land at Mouza-Saharjora (Plasto Steel Park) for Setting of Iron and Steel Plant is a rejected industrial project in Saharjora, Barjora, Bankura, West Bengal. The site covers 113.6 acres.
Who is building it?
The applicant is Advay Udyog Private Limited.
Has it been approved?
No. The application was rejected on 1 Oct 2026.
Where is it?
In Saharjora, Barjora, Bankura, West Bengal.
How big is it?
It has a stated cost of ₹1,300 crore; a site of 113.6 acres and 97.6 acres (39.5 ha) of forest land.
When was it filed?
The application was filed on 27 Jun 2026.
Project details
| Status | Not approved |
|---|---|
| Status since | 1 Oct 2026 |
| Application filed | 27 Jun 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Industry |
| Applicant | Advay Udyog Private Limited |
| Land area | 113.6 acres (46 ha) |
| Forest land | 97.6 acres (39.5 ha) |
| Project cost | ₹1,300 crore |
| Village / locality | Saharjora |
| Taluk / tehsil | Barjora |
| District | Bankura |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01991 |
In context
69 applications in Bankura since January 2022 are in the same category (Industry): 29 approved, 23 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 113.6 acres, this one is larger than 94% of them.
32 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Saharjora, Barjora, Bankura, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed expansion project by installation of 4X30 T Induction Furnaces… — environmental approval granted, 850 m away
- Industrial project by SBEG Consultants Pvt. Ltd. — lapsed, 900 m away
- Environment Clearance (in compliance of the NGT order dt. 12.02.2020 in… — cleared for impact study, 1 km away
- Expansion of Existing Secondary Metallurgical Unit by Installing Additional… — cleared for impact study, 1.5 km away
- Transfer of Environmental Clearance (EC) granted by the Ministry of… — returned to applicant, 1.6 km away
- Transfer of Environmental Clearance (EC) granted by the Ministry of… — returned to applicant, 1.6 km away
- Proposed 0.13 MTPA Ferro Alloys Plant (6 X 9 MVA SAF, 2X6 T EAF, 2X15 T AOD,… — environmental approval granted, 1.9 km away
- Proposed 0.13 MTPA Ferro Alloys Plant (6 X 9 MVA SAF, 2X6 T EAF, 2X15 T AOD,… — under environmental review, 2.1 km away