Quick answers
What is this project?
Proposed expansion of existing Steel Plant by installation of 1x350 TPD + 1x600 TPD DRI Kilns, 4x20 T Induction Furnaces & 1x30 T Electric Arc Furnace with matching LRF & CCM, 1,20,000 TPA capacity Rolling Mill, 10,000 TPA capacity Galvanization Plant is a proposed industrial project in Kamnara, Burdwan - I, Purba Bardhaman, West Bengal. The site covers 118.7 acres.
Who is building it?
The applicant is N N Ispat Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Kamnara, Burdwan - I, Purba Bardhaman, West Bengal.
How big is it?
It has a stated cost of ₹171 crore and a site of 118.7 acres.
When was it filed?
The application was filed on 4 Oct 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed expansion of existing Steel Plant by installation of 1x350 TPD + 1x600 TPD DRI…
Project details
| Official title | Proposed expansion of existing Steel Plant by installation of 1x350 TPD + 1x600 TPD DRI Kilns, 4x20 T Induction Furnaces & 1x30 T Electric Arc Furnace with matching LRF & CCM, 1,20,000 TPA capacity Rolling Mill, 10,000 TPA capacity Galvanization Plant along with 32 MW capacity Captive Power Plant (22 MW WHRB + 10 MW AFBC). |
|---|---|
| Status | Returned to applicant |
| Status since | 29 Aug 2025 |
| Application filed | 4 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | N N Ispat Private Limited |
| Land area | 118.7 acres (48 ha) |
| Project cost | ₹171 crore |
| Village / locality | Kamnara |
| Taluk / tehsil | Burdwan - I |
| District | Purba Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00871 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 27 May 2026 | Environmental approval granted | 49 acres | ₹171.2 crore |
| Expansion filed 4 Oct 2024 (this page) | Returned to applicant | 118.7 acres | ₹171 crore |
In context
21 applications in Purba Bardhaman since January 2022 are in the same category (Industry): 9 approved, 8 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 118.7 acres, this one is larger than 81% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kamnara, Burdwan - I, Purba Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of EC for "Proposed expansion of existing Steel Plant by installation… — lapsed, 0 m away
- Proposed expansion of existing Steel Plant by installation of 1x350 TPD +… — environmental approval granted, 0 m away
- Environmental Clearance for Mini Township "UPANTIKA" by Poddar Projects… — environmental approval granted, 900 m away
- A mini Township "UPANTIKA" by Poddar Projects Limited. — not approved, 900 m away
- Proposed greenfield steel plant by setting up 1 X 200 TPD DRI Plant, 2 X 20 T… — lapsed, 1000 m away
- Proposed greenfield steel plant by setting up 1 X 200 TPD DRI Plant, 2 X 20 T… — cleared for impact study, 1.1 km away
- Proposed greenfield steel plant by setting up 1 X 200 TPD DRI Plant, 2 X 20 T… — returned to applicant, 1.1 km away
- Proposed expansion of existing steel plant by installation of 2x500 TPD DRI… — returned to applicant, 1.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.