Quick answers
What is this project?
Proposed expansion of existing Steel Plant by installation of 1x350 TPD + 1x600 TPD DRI Kilns, 4x20 T Induction Furnaces & 1x30 T Electric Arc Furnace with matching LRF & CCM, 1,20,000 TPA capacity Rolling Mill, 10,000 TPA capacity Galvanization Plant is an approved industrial project in Kamnara, Burdwan - I, Purba Bardhaman, West Bengal. The site covers 49 acres.
Who is building it?
The applicant is N N Ispat Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 22 Jul 2026), as of 27 Nov 2026.
Where is it?
In Kamnara, Burdwan - I, Purba Bardhaman, West Bengal.
How big is it?
It has a stated cost of ₹171.2 crore and a site of 49 acres.
When was it filed?
The application was filed on 27 May 2026.
Project details
| Official title | Proposed expansion of existing Steel Plant by installation of 1x350 TPD + 1x600 TPD DRI Kilns, 4x20 T Induction Furnaces & 1x30 T Electric Arc Furnace with matching LRF & CCM, 1,20,000 TPA capacity Rolling Mill, 10,000 TPA capacity Galvanization Plant along with 32 MW Captive Power Plant (22 MW WHRB + 10 MW AFBC) |
|---|---|
| Status | Environmental approval granted |
| Status since | 22 Jul 2026 |
| Application filed | 27 May 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | N N Ispat Private Limited |
| Land area | 49 acres (19.8 ha) |
| Project cost | ₹171.2 crore |
| Village / locality | Kamnara |
| Taluk / tehsil | Burdwan - I |
| District | Purba Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01786 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 27 May 2026 (this page) | Environmental approval granted | 49 acres | ₹171.2 crore |
| Expansion filed 4 Oct 2024 | Returned to applicant | 118.7 acres | ₹171 crore |
In context
21 applications in Purba Bardhaman since January 2022 are in the same category (Industry): 9 approved, 8 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 49 acres, this one is larger than 57% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kamnara, Burdwan - I, Purba Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of EC for "Proposed expansion of existing Steel Plant by installation… — lapsed, 0 m away
- Proposed expansion of existing Steel Plant by installation of 1x350 TPD +… — returned to applicant, 0 m away
- Environmental Clearance for Mini Township "UPANTIKA" by Poddar Projects… — environmental approval granted, 900 m away
- A mini Township "UPANTIKA" by Poddar Projects Limited. — not approved, 900 m away
- Proposed greenfield steel plant by setting up 1 X 200 TPD DRI Plant, 2 X 20 T… — lapsed, 1000 m away
- Proposed greenfield steel plant by setting up 1 X 200 TPD DRI Plant, 2 X 20 T… — cleared for impact study, 1.1 km away
- Proposed greenfield steel plant by setting up 1 X 200 TPD DRI Plant, 2 X 20 T… — returned to applicant, 1.1 km away
- Proposed expansion of existing steel plant by installation of 2x500 TPD DRI… — returned to applicant, 1.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.