Proposed greenfield steel plant by setting up 1 X 200 TPD DRI Plant, 2 X 20 T Induction Furnaces, 1 X 4.5 MVA SEAF alongwith 1 X 50 TPD Sinter & 1 X 2 TPH Cr. Ore Briquette Plant, 1,00,000 TPA Rolling Mill and WHRB based 8 MW Captive Power Plant is a lapsed industrial project in Mirzapur, Burdwan - I, Purba Bardhaman, West Bengal. The site covers 37.2 acres.
Who is building it?
The applicant is SALAGRAM METALICS private limited.
Has it been approved?
No. The application was lapsed on 26 Nov 2026, so it is no longer under consideration.
Where is it?
In Mirzapur, Burdwan - I, Purba Bardhaman, West Bengal.
How big is it?
It has a stated cost of ₹190 crore and a site of 37.2 acres.
When was it filed?
The application was filed on 22 Oct 2026.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed greenfield steel plant by setting up 1 X 200 TPD DRI Plant, 2 X 20 T Induction…
Project details
| Status | Lapsed |
|---|---|
| Status since | 26 Nov 2026 |
| Application filed | 22 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | SALAGRAM METALICS private limited |
| Land area | 37.2 acres (15.1 ha) |
| Project cost | ₹190 crore |
| Village / locality | Mirzapur |
| Taluk / tehsil | Burdwan - I |
| District | Purba Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01710 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 22 Oct 2026 (this page) | Lapsed | 37.2 acres | ₹190 crore |
| Early planning filed 25 Mar 2026 | Cleared for impact study | 53.8 acres | ₹190 crore |
| Early planning filed 25 Nov 2025 | Returned to applicant | 53.8 acres | ₹190 crore |
In context
21 applications in Purba Bardhaman since January 2022 are in the same category (Industry): 9 approved, 8 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 37.2 acres, this one is larger than 52% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mirzapur, Burdwan - I, Purba Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed greenfield steel plant by setting up 1 X 200 TPD DRI Plant, 2 X 20 T… — cleared for impact study, 550 m away
- Proposed greenfield steel plant by setting up 1 X 200 TPD DRI Plant, 2 X 20 T… — returned to applicant, 550 m away
- Transfer of EC for "Proposed expansion of existing Steel Plant by installation… — lapsed, 1000 m away
- Proposed expansion of existing Steel Plant by installation of 1x350 TPD +… — environmental approval granted, 1000 m away
- Proposed expansion of existing Steel Plant by installation of 1x350 TPD +… — returned to applicant, 1000 m away
- Environmental Clearance for Mini Township "UPANTIKA" by Poddar Projects… — environmental approval granted, 1.1 km away
- A mini Township "UPANTIKA" by Poddar Projects Limited. — not approved, 1.1 km away
- Expansion of Existing Steel Plant by Installation of 6 No. 10 MT Induction… — returned to applicant, 1.2 km away
All 3 SALAGRAM METALICS projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.