Quick answers
What is this project?
Environmental Clearance for Mini Township "UPANTIKA" by Poddar Projects Limited at Mouza- Kamnara & Mirzapur, P.S.: Burdwan, Dist.: Purba Burdwan, Pin: 713104, West Bengal is an approved mixed-use project in Saraitikar, Burdwan - I, Purba Bardhaman, West Bengal. It plans 1,008 units of up to 4 floors on 39.1 acres.
Who is building it?
The applicant is Poddar Projects Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 6 Aug 2025), as of 27 Nov 2026.
Where is it?
In Saraitikar, Burdwan - I, Purba Bardhaman, West Bengal.
How big is it?
It has a stated cost of ₹197.7 crore and a site of 39.1 acres.
When was it filed?
The application was filed on 16 Jun 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Aug 2025 |
| Application filed | 16 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Poddar Projects Limited |
| Use | Mixed use |
| Units | 1,008 |
| Floors (tallest) | 4 |
| Parking spaces | 492 |
| Land area | 39.1 acres (15.8 ha) |
| Built-up area | 1,19,298 m² (12,84,112 sq ft) |
| Plot area | 1,03,163 m² (11,10,436 sq ft) |
| Project cost | ₹197.7 crore |
| Village / locality | Saraitikar |
| Taluk / tehsil | Burdwan - I |
| District | Purba Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01297 |
In context
5 applications in Purba Bardhaman since January 2022 are in the same category (Buildings & townships): 3 approved, 1 filed or under review, and 1 withdrawn, lapsed or rejected.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Saraitikar, Burdwan - I, Purba Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- A mini Township "UPANTIKA" by Poddar Projects Limited. — not approved, 100 m away
- Proposed greenfield steel plant by setting up 1 X 200 TPD DRI Plant, 2 X 20 T… — cleared for impact study, 650 m away
- Proposed greenfield steel plant by setting up 1 X 200 TPD DRI Plant, 2 X 20 T… — returned to applicant, 650 m away
- Proposed expansion of existing Steel Plant by installation of 1x350 TPD +… — returned to applicant, 900 m away
- Transfer of EC for "Proposed expansion of existing Steel Plant by installation… — lapsed, 900 m away
- Proposed expansion of existing Steel Plant by installation of 1x350 TPD +… — environmental approval granted, 900 m away
- Proposed greenfield steel plant by setting up 1 X 200 TPD DRI Plant, 2 X 20 T… — lapsed, 1.1 km away
- Environment Clearance for the existing Rolling Mills (as per MoEF&CC Gazette… — not approved, 1.9 km away
More from Poddar Projects Limited in Purba Bardhaman
- A mini Township "UPANTIKA" by Poddar Projects Limited. — not approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.