Proposed greenfield steel plant by setting up 1 X 200 TPD DRI Plant, 2 X 20 T Induction Furnaces, 1 X 4.5 MVA SEAF alongwith 1 X 50 TPD Sinter & 1 X 2 TPH Cr. Ore Briquette Plant, 1,00,000 TPA Rolling Mill and WHRB based 8 MW Captive Power Plant

Proposed greenfield steel plant by setting up 1 X 200 TPD DRI Plant, 2 X 20 T Induction Furnaces, 1 X 4.5 MVA SEAF alongwith 1 X 50 TPD Sinter & 1 X 2 TPH Cr. Ore Briquette Plant, 1,00,000 TPA Rolling Mill and WHRB based 8 MW Captive Power Plant is a proposed industrial project in Mirzapur, Burdwan - I, Purba Bardhaman, West Bengal. The site covers 53.8 acres. Its stated project cost is ₹190 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 22 May 2026).

See it on the live map All projects in Purba Bardhaman

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed greenfield steel plant by setting up 1 X 200 TPD DRI Plant, 2 X 20 T Induction Furnaces, 1 X 4.5 MVA SEAF alongwith 1 X 50 TPD Sinter & 1 X 2 TPH Cr. Ore Briquette Plant, 1,00,000 TPA Rolling Mill and WHRB based 8 MW Captive Power Plant is a proposed industrial project in Mirzapur, Burdwan - I, Purba Bardhaman, West Bengal. The site covers 53.8 acres.

Who is building it?

The applicant is SALAGRAM METALICS private limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 22 May 2026), as of 27 Nov 2026.

Where is it?

In Mirzapur, Burdwan - I, Purba Bardhaman, West Bengal.

How big is it?

It has a stated cost of ₹190 crore and a site of 53.8 acres.

When was it filed?

The application was filed on 25 Mar 2026.

Project details

StatusCleared for impact study
Status since22 May 2026
Application filed25 Mar 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantSALAGRAM METALICS private limited
Land area53.8 acres (21.8 ha)
Project cost₹190 crore
Village / localityMirzapur
Taluk / tehsilBurdwan - I
DistrictPurba Bardhaman
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-01595

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 22 Oct 2026Lapsed37.2 acres₹190 crore
Early planning filed 25 Mar 2026 (this page)Cleared for impact study53.8 acres₹190 crore
Early planning filed 25 Nov 2025Returned to applicant53.8 acres₹190 crore

In context

21 applications in Purba Bardhaman since January 2022 are in the same category (Industry): 9 approved, 8 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 53.8 acres, this one is larger than 67% of them.

9 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Mirzapur, Burdwan - I, Purba Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 SALAGRAM METALICS projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.