Quick answers
What is A mini Township "UPANTIKA" by Poddar Projects Limited.?
A mini Township "UPANTIKA" by Poddar Projects Limited is a rejected township project in Kamnara, Burdwan - I, Purba Bardhaman, West Bengal. The site covers 36.8 acres.
Who is building it?
The applicant is Poddar Projects Limited.
Has it been approved?
No. The application was rejected on 6 Aug 2025.
Where is it?
In Kamnara, Burdwan - I, Purba Bardhaman, West Bengal.
How big is it?
It has a stated cost of ₹143 crore and a site of 36.8 acres.
When was it filed?
The application was filed on 18 Jul 2024.
Project details
| Status | Not approved |
|---|---|
| Status since | 6 Aug 2025 |
| Application filed | 18 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Poddar Projects Limited |
| Use | Township |
| Land area | 36.8 acres (14.9 ha) |
| Project cost | ₹143 crore |
| Village / locality | Kamnara |
| Taluk / tehsil | Burdwan - I |
| District | Purba Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00889 |
In context
5 applications in Purba Bardhaman since January 2022 are in the same category (Buildings & townships): 3 approved, 1 filed or under review, and 1 withdrawn, lapsed or rejected.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kamnara, Burdwan - I, Purba Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for Mini Township "UPANTIKA" by Poddar Projects… — environmental approval granted, 100 m away
- Proposed greenfield steel plant by setting up 1 X 200 TPD DRI Plant, 2 X 20 T… — cleared for impact study, 750 m away
- Proposed greenfield steel plant by setting up 1 X 200 TPD DRI Plant, 2 X 20 T… — returned to applicant, 750 m away
- Proposed expansion of existing Steel Plant by installation of 1x350 TPD +… — returned to applicant, 900 m away
- Transfer of EC for "Proposed expansion of existing Steel Plant by installation… — lapsed, 900 m away
- Proposed expansion of existing Steel Plant by installation of 1x350 TPD +… — environmental approval granted, 900 m away
- Proposed greenfield steel plant by setting up 1 X 200 TPD DRI Plant, 2 X 20 T… — lapsed, 1.1 km away
- Environment Clearance for the existing Rolling Mills (as per MoEF&CC Gazette… — not approved, 1.9 km away
More from Poddar Projects Limited in Purba Bardhaman
- Environmental Clearance for Mini Township "UPANTIKA" by Poddar Projects… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.