Cleared for impact studyIndustry · Raipur, Chhattisgarh

Greenfield steel plant comprising of Pelletization plant 0.9 MTPA, along Coal Gasifier for pellet plant-1 x 18,750 M3/Hr. DRI Kilns 4x350 TPD – 4,62,000 TPA), Induction Furnaces (Hot Billets/Billets/Ingots 5x25 T- 4,12,500 TPA), Rolling Mills(TMT bars/Structural Steel)(85% Hot charging with Hot Billets and remaining 15% through RHF with Producer gas as fuel–3,92,700 TPA)

Greenfield steel plant comprising of Pelletization plant 0.9 MTPA, along Coal Gasifier for pellet plant-1 x 18,750 M3/Hr. DRI Kilns 4x350 TPD – 4,62,000 TPA), Induction Furnaces (Hot Billets/Billets/Ingots 5x25 T- 4,12,500 TPA), Rolling Mills(TMT bars/Structural Steel)(85% Hot charging with Hot Billets and remaining 15% through RHF with Producer gas as fuel–3,92,700 TPA) is a proposed industrial project in Mohada, Tilda, Raipur, Chhattisgarh. The site covers 255.6 acres. Its stated project cost is ₹1,250 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 21 Oct 2026).

See it on the live map All projects in Raipur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Greenfield steel plant comprising of Pelletization plant 0.9 MTPA, along Coal Gasifier for pellet plant-1 x 18,750 M3/Hr. DRI Kilns 4x350 TPD – 4,62,000 TPA), Induction Furnaces (Hot Billets/Billets/Ingots 5x25 T- 4,12,500 TPA), Rolling Mills(TMT bars/Structural Steel)(85% Hot charging with Hot Billets and remaining 15% through RHF with Producer gas as fuel–3,92,700 TPA) is a proposed industrial project in Mohada, Tilda, Raipur, Chhattisgarh. The site covers 255.6 acres.

Who is building it?

The applicant is Vraj Iron and Steel Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 21 Oct 2026), as of 27 Nov 2026.

Where is it?

In Mohada, Tilda, Raipur, Chhattisgarh.

How big is it?

It has a stated cost of ₹1,250 crore and a site of 255.6 acres.

When was it filed?

The application was filed on 10 Oct 2026.

Project details

Official titleEstablishment of Greenfield steel plant comprising of Pelletization plant 0.9 MTPA, along Coal Gasifier for pellet plant-1 x 18,750 M3/Hr. DRI Kilns 4x350 TPD – 4,62,000 TPA), Induction Furnaces (Hot Billets/Billets/Ingots 5x25 T- 4,12,500 TPA), Rolling Mills(TMT bars/Structural Steel)(85% Hot charging with Hot Billets and remaining 15% through RHF with Producer gas as fuel–3,92,700 TPA), along with Coal gasifier for RHF-1x4,000 NM3/Hr, Coal Washery Unit–12,00,000 TPA, Submerged Electric Arc Fu
StatusCleared for impact study
Status since21 Oct 2026
Application filed10 Oct 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantVraj Iron and Steel Limited
Land area255.6 acres (103.4 ha)
Project cost₹1,250 crore
Village / localityMohada
Taluk / tehsilTilda
DistrictRaipur
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-02994

In context

219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 255.6 acres, this one is larger than 94% of them.

7 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Mohada, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Vraj Iron and Steel projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.