Quick answers
What is this project?
Greenfield steel plant comprising of Pelletization plant 0.9 MTPA, along Coal Gasifier for pellet plant-1 x 18,750 M3/Hr. DRI Kilns 4x350 TPD – 4,62,000 TPA), Induction Furnaces (Hot Billets/Billets/Ingots 5x25 T- 4,12,500 TPA), Rolling Mills(TMT bars/Structural Steel)(85% Hot charging with Hot Billets and remaining 15% through RHF with Producer gas as fuel–3,92,700 TPA) is a proposed industrial project in Mohada, Tilda, Raipur, Chhattisgarh. The site covers 255.6 acres.
Who is building it?
The applicant is Vraj Iron and Steel Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 21 Oct 2026), as of 27 Nov 2026.
Where is it?
In Mohada, Tilda, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹1,250 crore and a site of 255.6 acres.
When was it filed?
The application was filed on 10 Oct 2026.
Project details
| Official title | Establishment of Greenfield steel plant comprising of Pelletization plant 0.9 MTPA, along Coal Gasifier for pellet plant-1 x 18,750 M3/Hr. DRI Kilns 4x350 TPD – 4,62,000 TPA), Induction Furnaces (Hot Billets/Billets/Ingots 5x25 T- 4,12,500 TPA), Rolling Mills(TMT bars/Structural Steel)(85% Hot charging with Hot Billets and remaining 15% through RHF with Producer gas as fuel–3,92,700 TPA), along with Coal gasifier for RHF-1x4,000 NM3/Hr, Coal Washery Unit–12,00,000 TPA, Submerged Electric Arc Fu |
|---|---|
| Status | Cleared for impact study |
| Status since | 21 Oct 2026 |
| Application filed | 10 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Vraj Iron and Steel Limited |
| Land area | 255.6 acres (103.4 ha) |
| Project cost | ₹1,250 crore |
| Village / locality | Mohada |
| Taluk / tehsil | Tilda |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02994 |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 255.6 acres, this one is larger than 94% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mohada, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed backward integration by establishment of 1 x 500 TPD DRI Kiln to… — cleared for impact study, 650 m away
- Proposed expansion in permitted capacities with inclusion of HRAP Steel… — cleared for impact study, 2.4 km away
- Greenfield Steel Plant Comprising of Pellet Plant1x2,000tpd–6,60,000tpa — under environmental review, 3.4 km away
- Green Field Project 2.2 MTPA Integrated Steel Plant at Khasra No. 746, 747,… — more information requested, 3.7 km away
- Expansion of Integrated Steel plant-Sponge Iron Plant-0.6 MTPA,Power Plant-125… — lapsed, 3.8 km away
- Expansion of existing integrated Steel Plant -DRI Kilns(Sponge Iron 0.6 MTPA… — environmental approval granted, 3.8 km away
- Expansion of existing integrated Steel Plant -DRI Kilns(Sponge Iron 0.6 MTPA… — cleared for impact study, 3.8 km away
- Transfer of Environment Clearance vide no. IA-J-11011/88/2023-IA-II(IND-I) dt.… — environmental approval granted, 5.6 km away
All 3 Vraj Iron and Steel projects across India