Quick answers
What is this project?
TOR amendment -Request for TOR amendment to Exempt Violation for our 90,000 TPA Rolling Mill (TOR granted by Ministry vide under violation category vide IA-J-11011/45/2023-IA-II(IND-I) & Proposal no. IA/CG/IND1/415808/2023 dated 3rd October 2023) is a lapsed industrial project in Sara\Pali, Tamnar, Raigarh, Chhattisgarh. The site covers 85.3 acres.
Who is building it?
The applicant is Raigarh Ispat and Power Private Limited.
Has it been approved?
No. The application was lapsed on 12 May 2026, so it is no longer under consideration.
Where is it?
In Sara\Pali, Tamnar, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹489 crore and a site of 85.3 acres.
When was it filed?
The application was filed on 24 Aug 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 12 May 2026 |
| Application filed | 24 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Raigarh Ispat and Power Private Limited |
| Land area | 85.3 acres (34.5 ha) |
| Project cost | ₹489 crore |
| Village / locality | Sara\Pali |
| Taluk / tehsil | Tamnar |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site area on record |
| Our reference | WID-CG-01239 |
In context
113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 85.3 acres, this one is larger than 51% of them.
55 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sara\Pali, Tamnar, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Steel Plant–Sponge Iron from 1,20,000 TPA to 4,17,000 TPA, MS… — cleared for impact study, 150 m away
- Amendments in Existing E.C. Issued to M/S. Raigarh Ispat PVT. LTD. Vide… — returned to applicant, 200 m away
- 132KV Transmission Line from CSPTCL 220/132/33 KV Substation Gerwani to M/s… — lapsed, 900 m away
- Expansion of Steel Plant – DRI Kilns (Sponge Iron from 60,000 TPA to 4,06,500… — environmental approval granted, 2.3 km away
- Expansion of Steel Plant – DRI Kilns (Sponge Iron from 60,000 TPA to 4,06,500… — cleared for impact study, 2.3 km away
- Diversion of Forest Land Proposed for Non-Forest Purpose Under Vss (Van… — lapsed, 2.4 km away
- 132KV Transmission Line from CSPTCL 220/132/33KV Substation Gerwani to M/s… — lapsed, 2.5 km away
- 2 X 95 Tpd Dri Kilns to Manufacture 62,700 Tpa of Sponge Iron, 2 X 3.0 MW of… — environmental approval granted, 2.6 km away
More from Raigarh Ispat and Power Private Limited in Raigarh
- Greenfield steel plant comprising of DRI Kilns (6,93,000 TPA), Induction… — environmental approval granted
- Amendments in Existing E.C. Issued to M/S. Raigarh Ispat PVT. LTD. Vide… — returned to applicant
- Greenfield steel plant comprising of DRI Kilns (6,93,000 TPA), Induction… — cleared for impact study
- Expansion of Steel Plant–Sponge Iron from 1,20,000 TPA to 4,17,000 TPA, MS… — cleared for impact study
All 5 Raigarh Ispat and Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.