Quick answers
What is this project?
Amendments in Existing E.C. Issued to M/S. Raigarh Ispat PVT. LTD. Vide No.J-11011/1040/2007/ Ia II (I) Dated 27th January 2010 for Correction and Consistence As Per the Current Scenario is a proposed industrial project in Sara\Pali, Tamnar, Raigarh, Chhattisgarh. The site covers 56.1 acres.
Who is building it?
The applicant is Raigarh Ispat and Power Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Sara\Pali, Tamnar, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹2.9 crore and a site of 56.1 acres.
When was it filed?
The application was filed on 30 Nov 2024.
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 13 Dec 2024 |
| Application filed | 30 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Raigarh Ispat and Power Private Limited |
| Land area | 56.1 acres (22.7 ha) |
| Project cost | ₹2.9 crore |
| Village / locality | Sara\Pali |
| Taluk / tehsil | Tamnar |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-01241 |
In context
113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 56.1 acres, this one is smaller than 57% of them.
55 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sara\Pali, Tamnar, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Steel Plant–Sponge Iron from 1,20,000 TPA to 4,17,000 TPA, MS… — cleared for impact study, 100 m away
- TOR amendment -Request for TOR amendment to Exempt Violation for our 90,000… — lapsed, 200 m away
- 132KV Transmission Line from CSPTCL 220/132/33 KV Substation Gerwani to M/s… — lapsed, 750 m away
- Expansion of Steel Plant – DRI Kilns (Sponge Iron from 60,000 TPA to 4,06,500… — environmental approval granted, 2.1 km away
- Expansion of Steel Plant – DRI Kilns (Sponge Iron from 60,000 TPA to 4,06,500… — cleared for impact study, 2.1 km away
- Diversion of Forest Land Proposed for Non-Forest Purpose Under Vss (Van… — lapsed, 2.2 km away
- 132KV Transmission Line from CSPTCL 220/132/33KV Substation Gerwani to M/s… — lapsed, 2.3 km away
- 2 X 95 Tpd Dri Kilns to Manufacture 62,700 Tpa of Sponge Iron, 2 X 3.0 MW of… — environmental approval granted, 2.5 km away
More from Raigarh Ispat and Power Private Limited in Raigarh
- Greenfield steel plant comprising of DRI Kilns (6,93,000 TPA), Induction… — environmental approval granted
- TOR amendment -Request for TOR amendment to Exempt Violation for our 90,000… — lapsed
- Greenfield steel plant comprising of DRI Kilns (6,93,000 TPA), Induction… — cleared for impact study
- Expansion of Steel Plant–Sponge Iron from 1,20,000 TPA to 4,17,000 TPA, MS… — cleared for impact study
All 5 Raigarh Ispat and Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.