What is Developing? Open the mapMap

Cleared for impact studyIndustry · Raigarh, Chhattisgarh

Expansion of Steel Plant–Sponge Iron from 1,20,000 TPA to 4,17,000 TPA, MS Ingots/Hot Billets from 90,000 TPA to 2,38,500 TPA, TMT bars/Rolled products from 90,000 TPA to 2,55,000 TPA (or) MS Strip Mill of 1,65,000 TPA (oR) MS Pipe Mill of 1,65,000 TPA, WHRB Power from 8.0 MW to 28 MW, FBC Power from 4 MW to 14MW,Ferro Alloys 2 x 9 MVA (FeSi-14,000 TPA/FeMn-50,400 TPA / SiMn–28,800 TPA/Fecr-30,000 TPA/Pig Iron–50,400 TPA), New Briquetting Plant (200 Kg/hr) & Fly Ash Brick Making unit (55,000 B

Expansion of Steel Plant–Sponge Iron from 1,20,000 TPA to 4,17,000 TPA, MS Ingots/Hot Billets from 90,000 TPA to 2,38,500 TPA, TMT bars/Rolled products from 90,000 TPA to 2,55,000 TPA (or) MS Strip Mill of 1,65,000 TPA (oR) MS Pipe Mill of 1,65,000 TPA, WHRB Power from 8.0 MW to 28 MW, FBC Power from 4 MW to 14MW,Ferro Alloys 2 x 9 MVA (FeSi-14,000 TPA/FeMn-50,400 TPA / SiMn–28,800 TPA/Fecr-30,000 TPA/Pig Iron–50,400 TPA), New Briquetting Plant (200 Kg/hr) & Fly Ash Brick Making unit (55,000 B is a proposed industrial project in Sara\Pali, Tamnar, Raigarh, Chhattisgarh. The site covers 85.3 acres. Its stated project cost is ₹489 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 20 Apr 2023).

See it on the live map All projects in Raigarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Steel Plant–Sponge Iron from 1,20,000 TPA to 4,17,000 TPA, MS Ingots/Hot Billets from 90,000 TPA to 2,38,500 TPA, TMT bars/Rolled products from 90,000 TPA to 2,55,000 TPA (or) MS Strip Mill of 1,65,000 TPA (oR) MS Pipe Mill of 1,65,000 TPA, WHRB Power from 8.0 MW to 28 MW, FBC Power from 4 MW to 14MW,Ferro Alloys 2 x 9 MVA (FeSi-14,000 TPA/FeMn-50,400 TPA / SiMn–28,800 TPA/Fecr-30,000 TPA/Pig Iron–50,400 TPA), New Briquetting Plant (200 Kg/hr) & Fly Ash Brick Making unit (55,000 B is a proposed industrial project in Sara\Pali, Tamnar, Raigarh, Chhattisgarh. The site covers 85.3 acres.

Who is building it?

The applicant is Raigarh Ispat and Power Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 20 Apr 2023), as of 27 Nov 2026.

Where is it?

In Sara\Pali, Tamnar, Raigarh, Chhattisgarh.

How big is it?

It has a stated cost of ₹489 crore and a site of 85.3 acres.

When was it filed?

The application was filed on 20 Apr 2023.

Project details

StatusCleared for impact study
Status since20 Apr 2023
Application filed20 Apr 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantRaigarh Ispat and Power Private Limited
Land area85.3 acres (34.5 ha)
Project cost₹489 crore
Village / localitySara\Pali
Taluk / tehsilTamnar
DistrictRaigarh
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-00694

In context

113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 85.3 acres, this one is larger than 51% of them.

55 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Sara\Pali, Tamnar, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Raigarh Ispat and Power Private Limited in Raigarh

All 5 Raigarh Ispat and Power projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.