Quick answers
What is 4g Saturation Project for Mundagod Taluka Forest Land?
4g Saturation Project for Mundagod Taluka Forest Land is a lapsed project in Hire Bachanki, Mundgod, Uttara Kannada, Karnataka. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 13 Aug 2025, so it is no longer under consideration.
Where is it?
In Hire Bachanki, Mundgod, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹50 lakh; a site of 0 acres and 2,840 m² of forest land.
When was it filed?
The application was filed on 31 Jan 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 13 Aug 2025 |
| Application filed | 31 Jan 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 2,840 m² |
| Project cost | ₹50 lakh |
| Village / locality | Hire Bachanki |
| Taluk / tehsil | Mundgod |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-07276 |
In context
82 applications in Uttara Kannada since January 2022 are in the same category (Other): 3 approved, 36 filed or under review, and 22 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 97% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hire Bachanki, Mundgod, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sewage Treatement Plant(STP) Mundgod — under forest review, 4.9 km away
- Sewage Treatment Plant — lapsed, 5 km away
- Road for School — more information requested, 5.9 km away
- Road for School — lapsed, 5.9 km away
- Diversion of forest land in Survey No. 17 of Hosahalli village ,Survey no : 55… — lapsed, 18.5 km away
- Bsnl 4g Saturation Project Hotageri — forest land use approved, 22.2 km away
- 4g Saturation Project for Row of Non Forest Land in Mundagod Taluka — lapsed, 24 km away
- Diversion of 12.329 Ha of Forest land in Bankasali, Mainalli, Madanuru,… — lapsed, 24.3 km away
More from Mahesh Nair in Uttara Kannada
- Bsnl 4g Saturation Project Underground Optical Fiber Laying for Kanur,… — initial checks
- Optical Fiber Cable Laying Under 4g Satuaration Project for Achave Kuntakani… — under wildlife review
- Bsnl Usof 4g Saturation Project — under forest review
- Bsnl 4g Saturation Project Ofc Route Veeranjol, Palada, Vatla Form E — under forest review
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — more information requested
- Bsnl 4g Saturation Tower Project Ofc Route Aveda Popalwadi — under forest review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.